• Project Bio – Dreamlifter Operations Center
  • General Contractor:  Walsh Construction
  • Architect & Engineer: CH2M Hill
  • Location: Paine field, Everett, Wa.
  • Completion:  October 2013

The Dreamlifter operations center is the Everett base for the Dreamlifter transport aircraft.  The building includes maintenance and office spaces to support operations for the 787 Dreamliner. Hawk Mechanical was tasked with leading BIM Coordination along with installation of plumbing, piping and HVAC systems for the center.